Reefer PTI

Image 01

Supplied by electricity 105 KVA.

The storage yard sets special areas for reefer stacking and PTI test, which can fully guarantee the power demand of reefer of the shipping company.

PTI area is equipped with container cleaning equipment, which can realize that container cleaning, pre-cooling and PTI test are conducted at the same time.



Image 01

Testimonials

The best services for customers can make us to advanced and get more experience.

Nana S - COO, New ADT

We run a business not always want to achieved profit, but we are trying to serve our best and growing up, although that was a little bit.

Rudy - CEO, New ADT
Image 01

Container Yard

15.0000 Sqm full Concrated yard for containers storage, Maximum Storage Capacty with 3.500 Teus ...

Image 02

Container Inspection

All trucks of import containers that are already cleared by Customs are required to secure ...

Image 05

Computerized

We are using a Database Depot system that we call it the "Inventory", it woul d store and submitted ...

Image 04

Container Repair

Capacity 60 teus, with our profesionals repair man can be optimezed to 100 box per-day ...

Image 03

Reefer PTI

The storage yard sets special areas for reefer stacking and PTI test, which can fully guarantee the power ...